Posts Tagged ‘vn engineers’
Washington Bridge: READ 1st draft report, with dramatic findings. Lane changes, other bridges.
“…under sufficient load the bridge could fail with limited to no advanced warning”. Sentences similar to this are scattered throughout the draft of the first report to be received by RI DOT. This report is done by VN Engineers. While media outlets were quick to say they had obtained the report first – reporter Brian…
Read More